Cefni Boardwalk & Footbridge: New Timber Bridge

   

This contract involved replacing an old timber bridge. The new bridge was 7m long and had timber decking either end leading up to the bridge. Once we’d finalized the bridge design the scheme was straight forward. There was a main road adjacent to the location which meant that we could crane the bridge directly into place. The bridge will be used by many walkers for a good few years to come.