Awel y Mor Rhosneigr: Galvanized Kee Klamp handrails

   

by Kate Watkiss

Another ongoing project installing galvanised tubular handrails with mid rail, posts and handrails galvanised and with 50mm OD tube with posts either dug and set in concrete foundation or bolted down to existing concrete.

These handrails can be installed to suit the required layout using various fittings, the top rail can be to the specified/required height.

See more projects